Hot and cold supply
PPR runs sized for sink, dishwasher and fridge-water connections

Ahmadi
Kitchen first fix at Ahmadi Stables starts by routing supply and waste before final wall construction. We map the hot and cold pipes and ventilation based on sink and cooker positions. Copper pipes and fittings are secured and pressure-tested before walls close.
Administrative buildings and dining facilities at Ahmadi Stables need large kitchens with twin or triple sinks and commercial cookers, which means complex piping layouts. We run hot water from the roof boiler or central heating, cold from the roof tank, and waste on a steady fall to vertical stacks. Every joint is air-tested before pipe cover.
Ahmadi Stables sits in Ahmadi governorate, a specialized facility with dining areas and offices that depend on reliable water supplies.
Before wall closure, every pipe section is air-tested at 10 bar for 15 minutes to confirm no leak exists.
PPR runs sized for sink, dishwasher and fridge-water connections
uPVC drain at correct fall to stop grease settling inside the pipe
Grease trap position and vent stack stub to block sewer odour entry
Gas supply stub-out to cooker position run before wall cladding closes
Supply and drain stub prepared at the right height for the water heater
Recorded pressure test on all supply lines before any wall is closed
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We wrap foam insulation around hot pipes across the various falls. Insulation cuts heat loss and protects pipes from condensation in cold storage rooms.
No, we separate them by at least 30 cm or use an insulation barrier. This prevents cold water contamination and protects waste pipes from summer condensation.