Hot and cold supply points
PPR lines routed precisely to basin, shower and toilet positions

Jahra
Bathroom and kitchen rough-in in Jahra Industrial requires robust pipe design for heavy flow demand. We run large supply lines from main collection tanks at high pressure, and thick waste drains that handle oils and debris. Every point gets tested under full load before facility opening, and we provide detailed drawings showing every buried pipe location.
Large factories and workshops in Jahra Industrial consume huge volumes of water for production and cleaning, which means main supply lines of 50mm diameter or larger. Changing rooms and canteens need separate waste from production lines so clean water does not mix with process water. We design a strong concrete base for heavy pipes and we check main tank height and booster pump positions to ensure fast water delivery.
Jahra Industrial sits in Jahra governorate, a zone dedicated to heavy manufacturing and workshops.
Main supply lines are pressure-tested at 6 bar for one hour before production starts because aged pipe joints leak slowly at first.
PPR lines routed precisely to basin, shower and toilet positions
uPVC drain runs laid at correct fall to prevent standing water
Floor trap levels set before screed to align flush with final tiling
Connecting the waste run to the vent stack prevents trap siphoning and odour
Documented pressure test on supply lines before walls are permanently closed
All supply and waste point locations recorded for finishing and future maintenance
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
That depends on machine type and available water. We connect filters and treatment before the main line if the client requires it, and we check pressure after the system to ensure production is not slowed.
Yes, if necessary treatment systems are in place. We separate clean waste from industrial waste, and we assess whether water can pass through a treatment tank before reuse or disposal.
