Horizontal drain runs
uPVC pipes graded to correct fall for each wet room and kitchen

Ahmadi
Drain lines laid right in Sabah Al-Ahmad City follow modern building codes and centralised planning. We run a deep main network feeding several buildings on steady falls. We fit robust collection stations and standardised inspection chambers. The whole network is tested by flow and filtration before handover.
Sabah Al-Ahmad City is a new urban plan with regular streets and standardised underground pipes. Foundations are close together and main lines run under roads at uniform depth. Near the commercial centre drain loads are heaviest, so we increase pipe diameter there. Inspection chambers sit at regular intervals for easy maintenance and cleaning. Every rise and bend is drawn to spec before any digging starts.
Sabah Al-Ahmad City lies in Ahmadi governorate as a planned coastal development with unified engineering, where drainage is integrated from phase one.
All network sections are tested by clean water flow measurement because any blockage causes fast flooding in dense urban areas.
uPVC pipes graded to correct fall for each wet room and kitchen
vent column fitted to prevent trap siphoning and sewer odour indoors
cleanout positions fixed before burial so future maintenance needs no breaking
floor traps set at correct level before screed is poured over them
building drain lines connected to the external sewer at correct invert level
all drain lines water-tested before burial to confirm joints are sound
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We calculate expected load per section and choose pipe diameter based on housing unit count. Intermediate collection stations separate loads and prevent excess pressure. Quarterly checks ensure sediment does not build up.
A calibrated chamber is built to uniform standard dimensions with exact measurement ports to read water level. This allows quick detection of blockages and sediment. Uniform chambers save maintenance and cleaning time.
