Hot and cold supply
PPR runs sized for sink, dishwasher and fridge-water connections

Ahmadi
Kitchen first fix in Sabah Al-Ahmad City requires coordination with centralised infrastructure. Supply, waste and vent lines run through pre-formed wall cavities. Pressure and flow are tested before site handover to finishing stages.
Buildings in Sabah Al-Ahmad City are modern and uniformly planned, with main supply lines coming from a central distribution point in each residential block. We trace the pipe route before concrete pours and run lines through external and internal walls following approved drawings. Kitchen waste connects to the main street drainage collector via a shared line that may serve several flats or units.
Sabah Al-Ahmad City in Ahmadi governorate is a newly planned coastal development where all infrastructure is integrated into one unified system.
Every waste line runs under flowing water for one hour to detect leaks before walls close.
PPR runs sized for sink, dishwasher and fridge-water connections
uPVC drain at correct fall to stop grease settling inside the pipe
Grease trap position and vent stack stub to block sewer odour entry
Gas supply stub-out to cooker position run before wall cladding closes
Supply and drain stub prepared at the right height for the water heater
Recorded pressure test on all supply lines before any wall is closed
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, each residential block has a main distribution chamber that splits cold and hot water to units. We connect the kitchen to pipes from this chamber and install a pressure strainer at the entry point.
Yes, if the shared line has sufficient diameter and steady fall to carry water from multiple units at once. We calculate the size based on kitchen count and flush the line with hot water to clear grease before handover.
