Plumbing and electrics first-fix
Coordinating pipe and conduit routes before screed is poured

Ahmadi
First-fix plumbing and electrics in Sabah Al-Ahmad City follows standardized architectural designs for hundreds of residential and commercial units. We document pipe routes on project plans, run copper and waste in pre-engineered voids, and test each building before labour shifts to cladding phases.
Sabah Al-Ahmad City is a planned urban development with precise specifications, containing flats, retail units and shared services in tall blocks. Kitchens and bathrooms in each unit must connect to unified main lines that run vertically in design-specified walls. We use international-standard copper tubing and uniform-diameter waste branches so later maintenance remains consistent across the entire project. Pressure testing occurs on each tower after pipe runs finish but before internal walls are built.
Sabah Al-Ahmad City sits in Ahmadi governorate on the coast, where construction follows a unified long-term development master-plan.
Water and waste lines in each tower are tested at 10 bar for two hours before handover to fit-out stages because rework delays project delivery schedules.
Coordinating pipe and conduit routes before screed is poured
Drain, supply and power points set to exact fixture positions
Water, drain and electrical lines serving appliances and sinks
Full first-fix for units in multi-storey residential buildings
Drain pipes laid at correct falls with required vent openings
Ground tank, roof tank and pressure pump pipe connections
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Each unit has a standard routing plan that specifies water and waste paths to the millimetre. We print the plan on site and follow it exactly without deviation except with supervisor approval.
We stop work immediately and notify the supervisor and consulting engineer. No path is altered without written approval because any change cascades across all identical units in the project.