Plumbing and electrics first-fix
Coordinating pipe and conduit routes before screed is poured

Mubarak Al-Kabeer
First-fix plumbing and electrics in Abu Fatira start with careful planning on engineering drawings. Cold water, hot water and waste distribute at steady slope through floors and walls before final concrete sets. Electrical wires sit in isolated ducts above pipe level. Full pressure and insulation testing happens before any finish coat or cladding.
Abu Fatira residential homes typically have multiple storeys with repeated bathrooms on each level, each bathroom needing independent waste pipes sloping toward a central waste stack. Supply lines rise from ground tank then branch horizontally on each floor before final connections. Electrical wires for lights, switches and outlets run in entirely separate ducts, kept away from any water or waste pipes.
Abu Fatira sits in Mubarak Al-Kabeer governorate, a modern residential zone where multi-storey buildings are common.
Every electrical circuit is tested for insulation at no less than 10 megohms before walls close because construction moisture may weaken insulation.
Coordinating pipe and conduit routes before screed is poured
Drain, supply and power points set to exact fixture positions
Water, drain and electrical lines serving appliances and sinks
Full first-fix for units in multi-storey residential buildings
Drain pipes laid at correct falls with required vent openings
Ground tank, roof tank and pressure pump pipe connections
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We raise supply pipes at least 30 centimetres above the crossing point, or angle sideways to avoid direct intersection. Every crossing is measured and documented before concrete covers it.
Never. Wires and pipes must occupy entirely separate ducts to avoid electrical leakage and corrosion. We use plastic conduit for wires and copper or steel for water and waste.