First-fix in Ardhiya Warehouses requires precise planning because buildings are long and deep, needing multiple distribution points. We locate the main riser and run horizontal lines under the floor with access covers for maintenance. Each section is tested separately before walls close.
Warehouses in Ardhiya are long, low-profile buildings with high ceilings and wide floors needing distributed pipework over long distances. We lay main waste pipes under the floor with steady fall towards one or more collection points. Electrical conduits run in separate under-floor ducts too, away from moisture and leaks. We check height, fall and fixings before concrete is poured.
Ardhiya Warehouses is located in Farwaniya governorate, a specialist storage district where drainage systems need reliable performance.
Each pipe section is tested under separate pressure before connecting to the main system to ensure every branch is clear of blockages.
Coordinating pipe and conduit routes before screed is poured
Drain, supply and power points set to exact fixture positions
Water, drain and electrical lines serving appliances and sinks
Full first-fix for units in multi-storey residential buildings
Drain pipes laid at correct falls with required vent openings
Ground tank, roof tank and pressure pump pipe connections
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We break the distance into stages and install a distribution box midway where possible to avoid pressure drop. Each box is pressure-tested separately before final connection.