Hot and cold supply points
PPR lines routed precisely to basin, shower and toilet positions

Farwaniya
Bathroom rough-in at Ardhiya Warehouses requires short, reliable waste runs before walls close. We run pipes from the elevated tank and set shower heads and taps at proper heights before construction finishes. Eight-bar air pressure checks full integrity. Correct installation means no hidden leaks under warehouse floors.
Warehouse buildings in Ardhiya have simple bathrooms with sloped floors toward one drain outlet. Pipes run beneath the slab to reach the external collection tank. We fit one showerhead and a hand tap at uniform height, then pressure-test every pipe with compressed air for cracks or holes. After air testing we fill the pipe with water and test again because air alone misses tiny leaks.
Ardhiya Warehouses sits in Farwaniya governorate, a commercial storage zone where broad concrete floors need precise pipe distribution.
Pipes are tested by air first then by water because small holes escape air pressure testing alone.
PPR lines routed precisely to basin, shower and toilet positions
uPVC drain runs laid at correct fall to prevent standing water
Floor trap levels set before screed to align flush with final tiling
Connecting the waste run to the vent stack prevents trap siphoning and odour
Documented pressure test on supply lines before walls are permanently closed
All supply and waste point locations recorded for finishing and future maintenance
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
In warehouses we prefer PVC because it resists corrosion from heavy use water and surveysPressure easily. We use tightly sealed joints and support them under the slab every metre.
Air testing reveals large holes and breaks, but tiny pinhole leaks that weep slowly show only in water testing. So we run both tests before handover.
