Plumbing and electrics first-fix
Coordinating pipe and conduit routes before screed is poured

Ahmadi
First-fix plumbing and electrics in Fahad Al-Ahmad means laying every pipe and wire before the builder closes the walls. We mark pipe routes on the plans, run copper supply and waste under floor slabs, and install electrical conduits before concrete is poured.
Fahad Al-Ahmad is a suburban area of modern family villas with separate kitchens, multiple bathrooms and open living spaces. The kitchen needs hot and cold supply lines and a separate grease trap distinct from main drainage, and secondary bathrooms need pipes buried in wall cavities before tiling. From first-fix we run pipes in set routes under floor slabs and inside wall chases per the plans so they do not cross electrical runs.
Fahad Al-Ahmad sits in Ahmadi governorate, a modern residential development where most villas are still passing through different build phases.
Before walls close, every water line is tested under hydraulic pressure to check joints because reopening walls later becomes very costly.
Coordinating pipe and conduit routes before screed is poured
Drain, supply and power points set to exact fixture positions
Water, drain and electrical lines serving appliances and sinks
Full first-fix for units in multi-storey residential buildings
Drain pipes laid at correct falls with required vent openings
Ground tank, roof tank and pressure pump pipe connections
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We use the building plans to mark separate routes for each pipe and wire type before cutting or laying anything. We maintain safe spacing between runs and document everything before walls are closed.
After all copper pipes and fittings are laid but before the builder adds insulation over walls. We fill the system and apply pressure for at least two hours to detect leaks at any joint.
