Hot and cold supply points
PPR lines routed precisely to basin, shower and toilet positions

Ahmadi
Bathroom rough-in in Fahad Al-Ahmad starts with mapping supply and waste before the walls go up. We run hot and cold lines from the plant room to every fixture point and set floor drains with proper fall. Each joint is tested under air pressure before drywall closes. The work follows code to prevent leaks or blockages later.
New houses in Fahad Al-Ahmad usually have a central plant room near the kitchen and main bathrooms, which lets us run lines from one source. We check floor drain position in each bathroom before concrete is poured, because moving it after construction means breaking the entire slab. We test the drainage fall on the actual site levels, not just on the plan, because finished levels often differ.
Fahad Al-Ahmad lies in Ahmadi governorate, a new suburban district of individual family villas where rough-in before finishing is standard practice.
Every supply and waste line is pressurised to 4 bar for at least one hour before handover because pressure reveals any pinhole in copper tube.
PPR lines routed precisely to basin, shower and toilet positions
uPVC drain runs laid at correct fall to prevent standing water
Floor trap levels set before screed to align flush with final tiling
Connecting the waste run to the vent stack prevents trap siphoning and odour
Documented pressure test on supply lines before walls are permanently closed
All supply and waste point locations recorded for finishing and future maintenance
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Lines inside walls give a clean look and protect pipes from damage and heat. If the build has ready-made chases in the walls we use them, otherwise we plan routes before walls close so we avoid cutting later.
We test with air pressure before concrete is poured, because any leak must be fixed before the pipes are buried. After the pour we do a flow test once the main supply is connected.