Plumbing and electrics first-fix
Coordinating pipe and conduit routes before screed is poured

Mubarak Al-Kabeer
Pipe and wire first-fix in Funaitees occurs before walls close accounting for the area's low topography. Cold and hot water lines are buried in floors at steady slope toward collection points. Waste pipes need extra checking for adequate fall. Electrical wires are installed in ducts completely isolated from pipe routes.
Funaitees residential area sits in relative lowland, meaning waste may need pumping in some cases if natural fall is insufficient. Supply pipes are distributed from tanks on roofs or ground floors depending on available height. Electrical wires for majlis, kitchens and bathrooms go in separate ducts, kept away from moisture and water pipes.
Funaitees sits in Mubarak Al-Kabeer governorate near the governorate centre, where low terrain affects waste system design.
Natural fall is measured on every waste line before any digging starts because a pump may be needed if slope proves insufficient.
Coordinating pipe and conduit routes before screed is poured
Drain, supply and power points set to exact fixture positions
Water, drain and electrical lines serving appliances and sinks
Full first-fix for units in multi-storey residential buildings
Drain pipes laid at correct falls with required vent openings
Ground tank, roof tank and pressure pump pipe connections
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We install a submerged sewage pump station at the low collection point that lifts water to the main outlet. The station runs full-flow testing before handover.
We use moisture-resistant plastic ducts with sealed covers on every opening. Wires themselves have thick insulation, and sockets and switches go in sealed boxes above potential seepage level.