Hot and cold supply points
PPR lines routed precisely to basin, shower and toilet positions

Mubarak Al-Kabeer
Bathroom rough-in in Funaitees starts by running hot and cold supply from the house tank to every fixture point. Waste from toilet, sink and shower slopes toward the floor trap. We measure fall, test pressure and fill trenches before handover.
Funaitees family homes are medium-sized with ground-floor and upper-floor bathrooms and floor traps in the rear yard. Rough-in needs separate pipe runs to the upper floor with steady fall across the longer distance. We test cold and hot together to find small holes before walls close. Shower waste pipes need adequate flow to prevent stagnation and smell. We hold pressure at the highest fixture on each floor and wait 30 minutes to verify stability.
Funaitees sits in Mubarak Al-Kabeer governorate, a medium-density family housing area needing reliable multi-storey rough-in.
Because the upper floor sits far from the floor trap, we test the horizontal run under higher pressure than the ground-floor bathroom section.
PPR lines routed precisely to basin, shower and toilet positions
uPVC drain runs laid at correct fall to prevent standing water
Floor trap levels set before screed to align flush with final tiling
Connecting the waste run to the vent stack prevents trap siphoning and odour
Documented pressure test on supply lines before walls are permanently closed
All supply and waste point locations recorded for finishing and future maintenance
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, they need insulation against heat from the ceiling above and moisture from the floor below. We use foam sleeves and keep supply pipes away from waste pipes for even heating.
We use tight compression fittings not solder at accessible points for later maintenance. Every joint gets visual inspection and soap-test for leaks.
