Plumbing and electrics first-fix
Coordinating pipe and conduit routes before screed is poured

Capital
High-rise flats and offices around Sharq Marina sit in different pressure zones, and first-fix plumbing and electrics in Sharq has to respect them. Lower floors receive a pressure reducing valve at the unit entry, while upper floors are checked for enough flow from the booster set.
In a tall Sharq tower the booster pumps have to push water to the top floors, which leaves the lower floors of each zone with more pressure than taps, mixers and flexible hoses are built for. First-fix fits a reducing valve and a gauge at the unit entry where needed, and chooses fittings rated for the zone. On the electrical side, conduits in a unit near NBK Head Office start from the floor's riser room, where the landlord's metering sits.
Sharq, the waterfront district between Kuwait Towers and Sharq Marina, is packed with high-rise offices and residential towers.
Flexible tap connectors on the lower floors of a boosted pressure zone wear faster without a reducing valve.
Coordinating pipe and conduit routes before screed is poured
Drain, supply and power points set to exact fixture positions
Water, drain and electrical lines serving appliances and sinks
Full first-fix for units in multi-storey residential buildings
Drain pipes laid at correct falls with required vent openings
Ground tank, roof tank and pressure pump pipe connections
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Lower floors of a boosted zone often see high pressure. A reducing valve at the flat entry brings it down to a level the fittings are designed for.
They are checked for adequate flow and pressure at the furthest fixture. If the building's booster falls short, that is raised with management before fittings are chosen.
