Horizontal drain runs
uPVC pipes graded to correct fall for each wet room and kitchen

Capital
Drainage first-fix in Sharq's high-rise towers has to plan for water falling dozens of storeys. Near Sharq Marina we fit long-radius bends at the foot of each stack, add a relief vent, and connect the lowest floors separately so pressure at the base cannot push back into their traps.
Water descending a tall Sharq stack reaches high speed, and at the base it must turn horizontal. A tight bend there creates a hydraulic jump that backs up flow and compresses air, which is why lower-floor traps in poorly designed towers bubble and smell. At first-fix we use two long-radius bends or a large-radius sweep at the foot, a relief vent tied into the stack just above it, and route the ground and first floor drains to the building sewer on their own, bypassing the stack's high-pressure zone.
Sharq, between Kuwait Towers and Sharq Marina, has high-rise towers whose drainage stacks run dozens of storeys to the basement.
Connecting the lowest floors directly to the building sewer keeps them clear of pressure at the stack's base.
uPVC pipes graded to correct fall for each wet room and kitchen
vent column fitted to prevent trap siphoning and sewer odour indoors
cleanout positions fixed before burial so future maintenance needs no breaking
floor traps set at correct level before screed is poured over them
building drain lines connected to the external sewer at correct invert level
all drain lines water-tested before burial to confirm joints are sound
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Pressure builds where a tall stack turns at its base. Keeping the lowest floors off the stack stops that pressure pushing foam and odour through their traps.
Often a relief vent and a replaced bend at the base can be added from the basement, which eases the problem considerably.
