Hot and cold supply points
PPR lines routed precisely to basin, shower and toilet positions

Capital
Bathroom rough-in in Sharq starts with marking every waste and supply point before walls close. We run hot and cold lines from central distribution boards and pressure-test every joint before tiling. Correct drainage fall and securely fixed pipes prevent problems years down the line.
Modern residential towers in Sharq run to ten storeys and higher, each unit with a master bath and guest bath, meaning multiple supply and waste lines need precise coordination. We size each pipe by consumption point count and distance from the distribution point, and test waste fall in every branch before handover. Near Kuwait Towers, luxury apartments often request separate bathrooms with independent pipework to ensure balanced water pressure.
Sharq sits in Kuwait governorate and holds modern residential towers where building code requires every drainage system to be tested before final construction.
Before walls close, every waste pipe is air-pressurized and the gauge monitored for five minutes to detect any hidden leaks.
PPR lines routed precisely to basin, shower and toilet positions
uPVC drain runs laid at correct fall to prevent standing water
Floor trap levels set before screed to align flush with final tiling
Connecting the waste run to the vent stack prevents trap siphoning and odour
Documented pressure test on supply lines before walls are permanently closed
All supply and waste point locations recorded for finishing and future maintenance
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We test pressure at every point with a gauge and adjust branch pipe diameter by distance from the main distribution board. If we find a big gap, we add a second distribution board or increase the diameter of the longer run.
Yes, but with a minimum five-centimetre gap to prevent moisture and odour transfer. We use separate clips for each pipe and ensure no direct contact.
