Hot and cold supply
PPR runs sized for sink, dishwasher and fridge-water connections

Capital
Kitchen first-fix plumbing in Abdullah Al-Salem starts before the builders close external and internal walls. We position hot and cold supply, waste and vent lines in their final spots. Each run is tested separately before the next stage begins. After that, drywall, tiles and paint can follow.
Abdullah Al-Salem houses are usually modern mid-rise buildings with open kitchens leading into living areas or separate rooms divided by light walls. This layout means the main waste line must run beneath the floor before final concrete is poured. Hot water pipes need good insulation because they pass between brick and plasterboard. We test water pressure and waste fall before any wall cavity is sealed. Near Abdullah Al-Salem Co-op, similar residential projects follow the same specifications.
Abdullah Al-Salem lies in Kuwait governorate, a modern residential suburb where kitchens are integrated with living spaces.
We inspect every threaded joint and compression fitting before sealing because hidden pipes do not allow easy repairs later.
PPR runs sized for sink, dishwasher and fridge-water connections
uPVC drain at correct fall to stop grease settling inside the pipe
Grease trap position and vent stack stub to block sewer odour entry
Gas supply stub-out to cooker position run before wall cladding closes
Supply and drain stub prepared at the right height for the water heater
Recorded pressure test on all supply lines before any wall is closed
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Right after pressure and fall testing is done. Make sure the technician completes the test sheet and gives you a copy before the builders close the walls. This protects you from dampness and leaks later.
No, any change needs concrete breaking and repouring. So we agree with the electrician and workers on the route before pouring starts. The plan helps everyone understand exact positions.
