Plumbing and electrics first-fix
Coordinating pipe and conduit routes before screed is poured

Capital
First-fix plumbing in Abdullah Al-Salem starts with reading blueprints and marking water, gas and waste routes on walls before concrete pour. We lay copper and plastic pipe paths and electrical conduit on each residential floor. Every pipe is air-tested under pressure before walls close. Handover includes an updated route drawing for the electrical crew.
Abdullah Al-Salem apartment buildings have multiple bathrooms per unit, each needing separate water feeds from the main riser. We run hot and cold supply pipes side by side with gaps left for thermal wrap. Waste pipes slope from upper floors to ground-floor collection points at a steady one-in-one-hundred fall. Floor traps in each bathroom connect to a vertical main line inside a structural wall. Space between pipes and conduit is kept clear so copper can be foam-wrapped before finishing.
Abdullah Al-Salem lies in Kuwait governorate, a new residential district of mid-rise apartment blocks where centralised water and waste runs are the standard layout.
After routing and pipe laying, each section is air-pressure tested for one minute because any leak will show as damp when walls are sealed.
Coordinating pipe and conduit routes before screed is poured
Drain, supply and power points set to exact fixture positions
Water, drain and electrical lines serving appliances and sinks
Full first-fix for units in multi-storey residential buildings
Drain pipes laid at correct falls with required vent openings
Ground tank, roof tank and pressure pump pipe connections
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We consult the structural engineer to identify permissible voids in load-bearing walls and use existing holes or request new ones before concrete pour. Large pipes are threaded carefully through the designated openings.
We photograph the error and notify the engineer and contractor before proceeding. Routes are adjusted per signed written instruction. Every change is logged in a daily report with an updated drawing.