Hot and cold supply
PPR runs sized for sink, dishwasher and fridge-water connections

Capital
Kitchen first fix in Dasma means setting out hot and cold supply runs and the waste trap before wall closure happens. We route supply from the roof tank, install the sink trap and test pressure and fall. Dasma kitchens sit high on the building so we account for tank elevation carefully. Everything is pressure-tested before plaster goes on.
Dasma residential buildings are old and compact, with the kitchen often opening directly to the majlis on one side and a guest toilet on the other. This means the main waste line is very short and pipes must pass beside structural columns. We measure the distance from sink position to the nearest vertical stack and ensure a steady fall of at least one in one hundred. Where space is tight we use narrow copper runs instead of heavy plastic.
Dasma lies in Kuwait governorate near the commercial and administrative centre, where older residential blocks stand in dense layout.
We test every joint with a hand pump because network pressure in Dasma varies throughout peak hours.
PPR runs sized for sink, dishwasher and fridge-water connections
uPVC drain at correct fall to stop grease settling inside the pipe
Grease trap position and vent stack stub to block sewer odour entry
Gas supply stub-out to cooker position run before wall cladding closes
Supply and drain stub prepared at the right height for the water heater
Recorded pressure test on all supply lines before any wall is closed
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We use thinner copper or give the waste line a slightly longer horizontal run beneath the floor with steady fall. Flow testing confirms water does not stall at any point.
Yes, we clear the stack with a snake or auger before connecting the new waste pipe. This ensures the first use does not back up and leak.