Hot and cold supply
PPR runs sized for sink, dishwasher and fridge-water connections

Capital
Kitchen first-fix in Kuwait City starts with running hot and cold supply lines and waste before walls are closed. We mark pipe routes on the concrete frame, secure them and pressure-test for leaks before any finishing begins. The technician coordinates with the main plumber and site to avoid conflicts with electrical conduits and other services.
Apartments and villas in Kuwait City vary in floor heights and distance from the kitchen to central water sources. We run vertical lines through existing walls or an internal column and direct waste with proper fall toward the main stack. Every threaded joint and floor trap is tested before the site moves to finishing.
Kuwait City is the capital where tall residential and commercial towers are concentrated, meaning kitchen runs must coordinate with complex building systems.
Every line is pressure-tested at steady hydraulic pressure for half an hour before first-fix sign-off, because any joint weakness only shows under load.
PPR runs sized for sink, dishwasher and fridge-water connections
uPVC drain at correct fall to stop grease settling inside the pipe
Grease trap position and vent stack stub to block sewer odour entry
Gas supply stub-out to cooker position run before wall cladding closes
Supply and drain stub prepared at the right height for the water heater
Recorded pressure test on all supply lines before any wall is closed
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We request electrical and mechanical layout drawings from site before starting. We mark pipe routes on concrete based on these drawings, maintaining safe clearances around existing ducts.
No, lines must be separate to prevent heat transfer between hot and cold supplies. We run each line in its own path with spacing between them or thermal insulation.
