Hot and cold supply
PPR runs sized for sink, dishwasher and fridge-water connections

Hawalli
Kitchen-first-fix in Siddiq starts with mapping all waste and supply stacks in the building. Dense kitchens in this tight residential district share a single stack, so we coordinate with other units and reserve space precisely. Every line is water-tested before plaster.
Multiple residential towers around Siddiq Co-op have tightly packed apartments with small kitchens separated by few load-bearing walls. There is no room for extra lines or side runs, so each kitchen waste must drop straight into shared stacks in party walls. We measure the floor traps below and number every joint so there is no confusion when vertical pipes are installed.
Siddiq lies in Hawalli governorate, a dense residential district of multiple-storey modern apartment blocks.
Every vertical waste joint is pressure-tested at steady flow for five minutes before being covered by concrete.
PPR runs sized for sink, dishwasher and fridge-water connections
uPVC drain at correct fall to stop grease settling inside the pipe
Grease trap position and vent stack stub to block sewer odour entry
Gas supply stub-out to cooker position run before wall cladding closes
Supply and drain stub prepared at the right height for the water heater
Recorded pressure test on all supply lines before any wall is closed
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Hot and cold supply pipes run separately up the wall, but waste from all kitchens in the stack enters one main line on the ground floor. We test each joint separately before final connection.
Before we cover any wall we confirm the final sink position, because moving the waste in a shared party wall affects other units. If they change their mind later, we need an extra connector and approval from building management.
