Plumbing and electrics first-fix
Coordinating pipe and conduit routes before walls are closed

Mubarak Al-Kabeer
First-fix plumbing in Masayel starts with a full site survey and measuring pipe runs from the main inlet to every bathroom and kitchen. We lay supply and drain lines before concrete is poured, fix support clamps and brackets, and pressure-test each section of the network.
New houses in Masayel typically require first-fix work across four or five bathrooms plus the kitchen and washing machine. This residential area demands tight floor falls before concrete pours, because correcting drainage after walls close becomes very expensive. We plan waste runs to slope toward the central collection pit, and fit insulation sleeves between cold and hot water lines to prevent heat transfer. Before the pour we transfer drawings to site, mark every bracket and floor trap position and test everything again.
Masayel lies in Mubarak Al-Kabeer governorate, a residential district of new family homes where projects demand solid first-fix work from the start.
We pressure-test the entire network before the pour because any leak will be buried in concrete and become hard to reach.
Coordinating pipe and conduit routes before walls are closed
Hot, cold and waste lines run to every sanitary point
Supply for sink, appliances and gas line inside the structure
Full pipe runs per unit including meter point positions
Drain lines laid to correct falls with proper vent stacks
Ground and roof tank connections integrated during structural stage
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Right before concrete pours. We fix all pipes and brackets, pressure-test under load and issue written approval before concrete trucks arrive.
Separate drawings are better because they show pipe diameters, falls, sleeves and bracket positions more clearly than the engineering plan. We review them before materials are ordered.
