Plumbing and electrics first-fix
Coordinating pipe and conduit routes before walls are closed

Hawalli
First-fix plumbing in Salwa starts with precise planning of hot, cold and waste lines before concrete is poured. We mark kitchen and bathroom positions on the plan and run pipes in correct sizes with steady waste falls. Every joint and every bend is pressure-tested before the walls close in. When we finish, no hidden leaks hide under tiles later.
Salwa houses are often two or three storeys with a main kitchen overlooking the rear yard and multiple bathrooms. Pipes must run through bearing columns and under concrete slabs, which means measuring every route before drilling. Where water tanks sit above the foundation we raise them at the corner and pressure-test from zero to full working pressure.
Salwa lies in Hawalli governorate near Salwa Co-op and Mishref Park, a villa district with strict construction standards.
Every waste line in Salwa is tested with a continuous water fill to confirm steady fall before walls close.
Coordinating pipe and conduit routes before walls are closed
Hot, cold and waste lines run to every sanitary point
Supply for sink, appliances and gas line inside the structure
Full pipe runs per unit including meter point positions
Drain lines laid to correct falls with proper vent stacks
Ground and roof tank connections integrated during structural stage
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We use copper or HDPE pipes in routes under slabs, with every joint welded or clamped to approved standards. Before concrete is poured we fill each pipe with water and compressed air to check for leaks.
Supply pipes carry clean water under pressure and are protected from sharp bends and unsupported runs. Waste pipes always slope toward the collection point and need a larger diameter because water moves by gravity, not pressure.
