Supply pipework
Hot and cold PPR lines run inside walls to each fixture

Capital
Bathroom and kitchen plumbing in Sawaber connects units in high-rises to a central drain system. We run pipes vertically through internal cores and route waste to the main stack. Each unit is tested at full pressure before handover.
Sawaber is a large tower complex at city centre with units of many sizes and duplex flats. Main stacks sit centrally in the blocks, easing horizontal distribution from the corridor. Drains slope steadily through wall voids and full pressure is tested in each unit before handover.
Sawaber sits at Kuwait City centre, a dense tower complex where plumbing relies on strong central stacks and a unified drain system.
Each unit is pressure-tested at steady pressure for thirty minutes immediately after connections are complete.
Hot and cold PPR lines run inside walls to each fixture
uPVC drain pipes set at correct fall to prevent sediment buildup
Dishwasher, sink and grease-trap connections run and tested
Individual valve per circuit so one fixture shuts off independently
Network pressurised before plastering to expose any weak joint
Toilets, basins and mixers connected after final finishes are complete
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Hot distribution pipes descend from the tank through internal cores with electric pumping to return cooled water downward. We fit pressure relief valves on each floor and wrap pipes in thick foam wrap.
Hot water settles in upper pipes but pressure drops quickly. We fit air valves at the top of stacks to prevent vacuum, and cold water falls naturally when the pump stops.