PEX pipe runs
Flexible concealed runs with the fewest cuts into finished walls

Capital
Flexible PEX in Sawaber delivers water from the building main meter to every unit in the dense residential towers. We run vertical tubing inside central service risers and branch horizontally with small local pressure regulators. Flow is tested in each unit separately. Hydraulic testing is mandatory because towers house hundreds of units.
Sawaber's central residential towers are large and densely built, so service risers must carry heavy loads of tubing and wiring. We select slightly larger PEX diameters at the main inlet to ensure adequate pressure at upper floors. Pressure regulators are fitted at the base of each branch so thin tubing does not burst at ground level. Expected daily water consumption is calculated and each floor is tested under peak demand before final acceptance.
Sawaber is a dense central residential zone near Kuwait City's downtown, home to tall apartment blocks housing hundreds of units.
Each PEX branch is tested at 2.5 bar for a full two hours because minor seepage in tall towers damages units on lower floors.
Flexible concealed runs with the fewest cuts into finished walls
Brass press fittings that need no flame or solvent cement
Run before walls close to confirm every joint is sound
One valve per circuit so any line can be shut independently
Set to prevent sludge build-up and recurring blockages
Tying the PEX network to every use point across the building
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We install a booster pump in the ground-floor plant room that draws water from the main tank and pushes it with force to upper levels. PEX tubing connects directly to the pump outlet and is tested under elevated pressure.
We leave spare connection points along each horizontal branch so an extra tap can be opened for the second unit. A separate meter is fitted for each new dwelling and coordinated with the central pressure regulator.