Bathroom plumbing
Supply and drain lines to all bathroom fixtures and outlets

Jahra
On new villas near Jahra Mall and New Jahra Co-op, plumbing installations in Jahra (New) follow the construction programme in stages. Underground drainage goes in before the ground slab, supply and waste pipes during blockwork, and fixtures only after finishes, with a test at every stage.
Drain pipes cast under a ground slab cannot be reached later without breaking concrete, so they are laid to line and fall, surrounded in bedding, and tested before the slab is poured. In Jahra builds we then set sleeves in beams before they are cast, install supply and waste pipes in walls during blockwork, and pressure test again before plaster. Fixtures go in at the end, followed by a final flow test across the whole house.
Jahra (New) is a residential part of Jahra governorate west of Kuwait City, where new family villas are being built near Jahra Mall.
Under slab drainage is tested for leaks before the ground floor slab is poured over it.
Supply and drain lines to all bathroom fixtures and outlets
Hot and cold supply lines and drain runs under the sink
Flexible PEX runs that handle Kuwait's high ambient temperatures well
Setting correct fall angles to prevent sediment buildup and early blockages
Isolation valves on every circuit so future repairs do not shut the whole building
Pressurising the network before plastering to catch any joint failure early
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Once concrete covers them, any leak or wrong fall means breaking the floor. Testing first catches problems while they are easy to fix.
Short tubes cast into beams or walls so pipes can pass through later without cutting structural concrete.