PEX pipe runs
Flexible concealed runs with the fewest cuts into finished walls

Capital
PEX plumbing networks in Jaber Al-Ahmad City serve thousands of new units with flexible safe tubing. We start from the pump station or entry meter and create a full distribution tree across storeys and flats. Each branch is tested separately before connecting to the main line. Handover includes a complete network map.
Jaber Al-Ahmad City is a modern development of high-rise blocks and uniform villa rows with repeated floor plans. This lets us standardise pipe lengths and fittings across each storey, cutting waste and errors. We run main lines through shared service shafts in the centre rather than along flat walls, saving space and material significantly.
Jaber Al-Ahmad City is in Kuwait governorate and ranks among the largest modern residential projects, requiring uniform and reliable water networks.
We pressure-test each floor's complete PEX network at 12 bar for two hours before interior finishing and painting begins.
Flexible concealed runs with the fewest cuts into finished walls
Brass press fittings that need no flame or solvent cement
Run before walls close to confirm every joint is sound
One valve per circuit so any line can be shut independently
Set to prevent sludge build-up and recurring blockages
Tying the PEX network to every use point across the building
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We prepare standard connection templates and test them in the first unit, then replicate them in every subsequent unit without delay. This cuts installation time significantly and ensures uniform quality across the entire project.
Yes, PEX tubing is easier to reroute than copper or steel, but potential extra routes must be planned at first build. We leave enough access points so any later changes can add branches without demolition.
