PEX pipe runs
Flexible concealed runs with the fewest cuts into finished walls

Hawalli
PEX plumbing in Mubarak Al-Abdullah is fitted during or right after construction work in this newly built Hawalli suburb, with lines cleared of any potential construction debris before the system is first filled with water in the new villa.
Mubarak Al-Abdullah's new villas have PEX lines run during construction, and levelling sand or cement dust can find its way into the pipe or manifold before final sealing if openings are not protected during other ongoing site work. We temporarily cap each line's ends after running them and before other construction work continues around the villa, flush the whole system before first fill to remove any debris that got in despite protection, and pressure-test each individual line on the manifold before handing the villa to the family.
Mubarak Al-Abdullah in Hawalli is a newly built villa community with new streets, where PEX lines are usually run during or right after construction finishes.
Flushing a PEX system in a new Mubarak Al-Abdullah villa before first fill removes debris that got in despite temporary end caps.
Flexible concealed runs with the fewest cuts into finished walls
Brass press fittings that need no flame or solvent cement
Run before walls close to confirm every joint is sound
One valve per circuit so any line can be shut independently
Set to prevent sludge build-up and recurring blockages
Tying the PEX network to every use point across the building
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We cap each line's ends temporarily after running them, but we still flush the whole system before first fill in case any debris got in regardless.
Yes, always, we pressure-test each line on the manifold individually before handover to confirm the whole system is free of any early leak.
