PEX pipe runs
Flexible concealed runs with the fewest cuts into finished walls

Hawalli
A flexible PEX network in Sha'ab serves apartment towers and flats with separate vertical and horizontal runs for each unit. We start from the central water meter and connect each riser across different floors with pressurized pipe. We test pressure and flow in every unit before handover to tenants.
In apartment towers near Sha'ab Leisure Park, vertical risers run along ceiling edges and inside partition walls between units. Each flat has one inlet point, from which we distribute hot and cold water towards the bathroom and kitchen in separate PEX lines. We fit isolation valves at each unit inlet to regulate pressure and simplify future maintenance.
Sha'ab is in Hawalli governorate near the seafront, a district of dense residential buildings and apartment blocks.
We test each riser separately before joining it to the next one to avoid transferring air or sediment between lines.
Flexible concealed runs with the fewest cuts into finished walls
Brass press fittings that need no flame or solvent cement
Run before walls close to confirm every joint is sound
One valve per circuit so any line can be shut independently
Set to prevent sludge build-up and recurring blockages
Tying the PEX network to every use point across the building
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Typically 5 to 7 working days, depending on tower height and existing conduits. Pipe laying, testing and documentation happen in parallel across multiple floors.
We disconnect the fitting and inspect it to check the pipe diameter is correct and the seal is intact. If the seal is damaged we replace the fitting with a new one of the same size and rating.
