PEX pipe runs
Flexible concealed runs with the fewest cuts into finished walls

Mubarak Al-Kabeer
Flexible PEX runs in Qurain provide reliable water networks for family houses needing upgrade or extension. We lay pipes from the main meter to every fixture point without metal couplings. Pressure and flow are tested before walls close. Work ends with a pipe route diagram.
Qurain houses often have aging copper or galvanised steel pipes that corrode, especially on upper floors and in kitchens. PEX runs avoid these issues because they resist water and bend easily around corners and obstacles. We pull pipes under ceilings or behind foundation walls, and test each branch from the main risers at 10 bar pressure for 24 hours before handover.
Qurain lies in Mubarak Al-Kabeer governorate, a relatively older residential district where water distribution systems need modernising.
PEX runs are pressure-tested for a full day before handover because even tiny leaks may not show in quick inspection.
Flexible concealed runs with the fewest cuts into finished walls
Brass press fittings that need no flame or solvent cement
Run before walls close to confirm every joint is sound
One valve per circuit so any line can be shut independently
Set to prevent sludge build-up and recurring blockages
Tying the PEX network to every use point across the building
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but we pull them through existing conduits or cut narrow channels in tiles. If no routes are available we suggest running under ceilings or behind foundation walls, which is faster and less invasive.
PEX is made from chemically stable material that withstands heat and mineral-laden water. We use European-standard pipes, and pre-commissioning testing ensures no manufacturing defects exist before use.
