PEX pipe runs
Flexible concealed runs with the fewest cuts into finished walls

Mubarak Al-Kabeer
PEX networks in Sabhan Industrial supply workshops and factories with reliable water from thick main lines. We start from the main supply meter and distribute pipes across warehouse roofs and metal walls. We test each branch under high pressure and install valves and taps at distribution points. Handover includes a schedule of every water outlet location and connected pipe diameter.
Warehouses and factories in Sabhan need pipes tough enough to withstand vibrations, heat and rapid pressure swings. We choose larger diameters than expected because factories draw heavy flows all at once. Pipes run overhead or through metal ducts for protection from machinery and trucks. At bends and junctions we use heavy steel supports because PEX needs firm fixing under vibration loads.
Sabhan Industrial sits in Mubarak Al-Kabeer governorate as a warehouse and factory zone where network pressure and flow demand exceeds residential areas.
We wait at least two hours after installing any industrial network before opening the main supply to allow pipes to settle.
Flexible concealed runs with the fewest cuts into finished walls
Brass press fittings that need no flame or solvent cement
Run before walls close to confirm every joint is sound
One valve per circuit so any line can be shut independently
Set to prevent sludge build-up and recurring blockages
Tying the PEX network to every use point across the building
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but we choose thicker-walled pipe for factories than homes. Every industrial network is tested at 2 megapascals for at least two hours. Valves and taps must also be rated for heavy pressure.
Yes, we cover them with protective metal sleeves or thick insulation to minimize temperature swings. Cold water in bare pipes may warm under intense sun, and hot water can cool quickly at night.