PEX pipe runs
Flexible concealed runs with the fewest cuts into finished walls

Mubarak Al-Kabeer
Flexible PEX runs in Abu Fatira supply residential apartment blocks from the main meter to every unit. We route tubing vertically in concealed shafts and horizontally within walls and ceilings. Flexibility allows complex paths with fewer metal connectors needed. Each floor is tested post-installation before unit handover.
Abu Fatira apartment blocks are mid-rise with isolated service shafts and standard wall cavities. Flexible runs pass easily through vertical shafts without complex angled fittings. Within partition walls we lay PEX with calculated slack to allow gradual thermal expansion. Between-floor ceilings receive metal clips at one-metre spacing to prevent vibration noise.
Abu Fatira sits in Mubarak Al-Kabeer governorate, a dense residential district where rapid network deployment meets high occupancy.
Each service shaft is pressure-tested at 8 bar for 30 minutes after installation to confirm no leaks before wall closure.
Flexible concealed runs with the fewest cuts into finished walls
Brass press fittings that need no flame or solvent cement
Run before walls close to confirm every joint is sound
One valve per circuit so any line can be shut independently
Set to prevent sludge build-up and recurring blockages
Tying the PEX network to every use point across the building
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Each unit receives separate branches from the main riser in the service shaft. This allows isolation of water supply to each unit and protects neighbours from pipe failures. An isolation valve sits before tubing enters each apartment.
The tubes themselves are quiet, but loose runs vibrate and strike walls as water surges. We secure PEX with clips every metre and place rubber pads under each clip to absorb vibration. We also test pressure regulator function to ensure no surging hot water jets from valves.
