PEX pipe runs
Flexible concealed runs with the fewest cuts into finished walls

Capital
Flexible PEX in Salhiya distributes water from the street main to every unit in modern residential towers. We house tubing inside central risers and branch lateral runs to adjacent apartments. Pipe diameters are sized for occupancy and consumption patterns. Testing and balancing are essential before final handover.
Salhiya's mid-rise residential towers have central service shafts carrying power, water and drainage together. When installing PEX, we must work with the construction crew to open shaft walls safely without weakening concrete. Vertical runs are fastened securely every meter and horizontal branches slope steadily toward collection points. Each unit gets its own meter so billing is accurate.
Salhiya is a modern residential zone near Sheraton Hotel in Kuwait City, housing towers with central collection systems.
Each horizontal branch is pitched at least 20 mm per meter to prevent stagnant water pooling inside the tubing.
Flexible concealed runs with the fewest cuts into finished walls
Brass press fittings that need no flame or solvent cement
Run before walls close to confirm every joint is sound
One valve per circuit so any line can be shut independently
Set to prevent sludge build-up and recurring blockages
Tying the PEX network to every use point across the building
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We use compression fittings pressed firmly onto tubing with sealed copper ferrules under the nut. Every joint is wiped clean and inspected visually before pressurization begins.
We install a small local pressure regulator at the unit inlet so it does not affect the rest of the tower. Pressure is tested with a digital gauge before and after fitting to ensure stability.
