Concealed frame fitting
Steel carrier frame anchored at the specified height inside the wall

Capital
Wall-hung toilet installation in Salhiya requires assessing wall thickness and space behind it for the frame and pipes. We anchor the structure firmly, connect water and waste lines and test each joint before completion.
Hotels and offices around Sheraton Hotel in central Salhiya have narrow bathrooms that cannot fit a standard pedestal toilet and tank. A wall-hung toilet reduces the floor space needed and makes daily floor cleaning easier. We open the wall, mount the frame on solid concrete backing and run pipes through the cavity with steady fall.
Salhiya sits in the heart of Kuwait governorate and houses commercial and hotel complexes, each requiring reliable bathroom facilities.
Every joint in the frame and pipes is tested under live water pressure before the wall is finally closed.
Steel carrier frame anchored at the specified height inside the wall
Waste pipe set at the correct fall to prevent backflow and odour
Supply line connected with an accessible isolation valve behind the service panel
Flush volume and fill valve pressure adjusted to stop continuous water loss
Bowl hung on frame studs with correct bolts and seat fitted firmly
Full leak check before wall is closed and again after cladding is in place
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
The wall should be solid concrete at least thirty centimetres thick to hold the frame and load. If the wall is thinner or hollow, we recommend extra concrete backing before anchoring.
The frame is anchored first, then the tiler comes to decorate around the frame and pipes with tiles. This ensures the frame is protected from moisture and decoration is uniform around pipe openings.