Bathroom plumbing
Supply and drain lines to all bathroom fixtures and outlets

Farwaniya
Plumbing installations in Rai Industrial serve workshops, storage and canteens. We locate the tank and pump and run large-diameter pipes to handle high pressure and continuous flow. Every joint is tested under high pressure before operation. Industrial pipes last long when built to spec.
Industrial buildings in Rai have high ceilings, wide spaces and thick concrete floors. This allows pipes to run long distances with low stable fall. Supply lines are mounted on strong metal stands that carry water weight and pressure. Drain pipes lie on level ground with steady slope toward the main trap or sump. Full-load pressure and flow testing happens before site handover.
Rai Industrial Area in Farwaniya governorate sits near The Avenues Mall and houses metal and wood workshops and large retail units.
We test industrial drain lines under full discharge for one hour to confirm they do not block during actual operation.
Supply and drain lines to all bathroom fixtures and outlets
Hot and cold supply lines and drain runs under the sink
Flexible PEX runs that handle Kuwait's high ambient temperatures well
Setting correct fall angles to prevent sediment buildup and early blockages
Isolation valves on every circuit so future repairs do not shut the whole building
Pressurising the network before plastering to catch any joint failure early
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We measure pressure first from the street outlet. If it is below 2 bar and you have high demand we recommend an electric pump or elevated tank. We choose it by maximum expected flow and how many taps open together.
We use strong steel stands every metre and anchor them with steel bolts into concrete. Small gaps between pipe and stand allow thermal expansion when heated. Every joint is welded or fitted with a reliable metal coupling.
