Washbasin and wall-hung basin
Countertop or wall-hung, with supply lines and a sealed waste trap.

Farwaniya
Fixture installation in Rai Industrial serves offices, small factories and shops where pipe and drainage loads run high. We check main supply lines, fit adequately-sized pipes and pressure-test them before use.
Industrial buildings in Rai have several bathrooms spread far apart and may sit far from the main drain line. We calculate how many fixtures run at once and the peak flow expected, then choose pipe size based on that. Drainage crosses thick concrete floors so we may need deep trenches or overhead runs. Roof tanks collect water to ensure adequate pressure at peak times when all taps are on.
Rai Industrial lies in Farwaniya governorate beside The Avenues Mall and houses many factories and offices.
We test industrial pipes at 1.5 times the expected working pressure to confirm they hold under heavy load.
Countertop or wall-hung, with supply lines and a sealed waste trap.
Wall or counter mount with correct waste outlet and supply valves.
Pan, cistern or in-wall frame, sealed base and flush line fitted correctly.
Tray, linear drain, riser and mixer connected and water-tested before tiling.
Set level, overflow solvent-welded, mixer and waste fully connected.
Supply, pump and jet lines connected with pressure test before finishing.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
It depends on pipe diameter, incoming pressure and available flow. Usually a 15mm pipe serves two or three taps well, and 20mm serves four or five. We calculate this at the first inspection.
Usually we fit new fixtures and lines separately from existing ones, then connect them only for final testing. If the building is occupied we may need a short water shutoff, an hour or less, to tie in the new line.
