Position and height
Basin set at a practical height and checked level before any connection is made.

Capital
An ablution basin installation in Salhiya focuses on positioning between the structural columns of the commercial complex and known floor traps. We measure distances carefully, choose basin height, connect waste and supply and check for leaks before departure.
Salhiya Commercial Complex houses shops, clinics and meeting halls, each with separate drainage systems. Large retailers and medical clinics usually have floor traps near their designated ablution areas. We inspect the existing connection first and judge whether to use the trap in place or run a new line to the main drainage hub. In smaller units we may mount a wall-hung basin on a robust bracket because the floor is too high above the trap.
Salhiya sits in Kuwait governorate next to Sheraton Hotel and is known for its major commercial and financial complexes.
All installations are tested with cold and hot water flowing together to verify pressure at each branch before handover.
Basin set at a practical height and checked level before any connection is made.
Trap and rubber seal fitted so waste drains fully with no odour return.
Braided flexible tails connected to isolation valves for future servicing.
Single-lever or separate taps set with PTFE tape and thread compound at every joint.
Non-fungal sanitary silicone applied along the full basin perimeter to keep moisture out.
Flow confirmed and every joint inspected for drips before the technician leaves.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, if the old pipes are sound copper or plastic with adequate diameter. We expose a section of existing pipe and inspect it by camera before any new connection.
A floor basin needs a trap directly beneath it, while wall-hung frees floor space and eases cleaning. We choose wall-hung if the shop is tight and the floor sits above the trap.
