Position and height
Basin set at a practical height and checked level before any connection is made.

Farwaniya
Installing an ablution basin in Hassawi begins by measuring the ground-floor majlis or bathroom where you need the washing point. We locate the nearest floor trap, run cold and hot supply lines and test the waste under full flow before completion.
Hassawi family houses have large, open majlis areas with stone or marble floors, and the floor trap is often already positioned in a corner. We measure the floor fall and trap depth, then choose the basin location for a short, steady waste line. If the trap is distant or too deep, we run a suspended waste pipe under the floor instead of deep excavation.
Hassawi lies in Farwaniya governorate, where traditional family houses with wide, floor-level majlis rooms equipped with floor traps dominate.
After fitting the basin, we fill the trap with water and monitor drainage to ensure no pooling under the floor.
Basin set at a practical height and checked level before any connection is made.
Trap and rubber seal fitted so waste drains fully with no odour return.
Braided flexible tails connected to isolation valves for future servicing.
Single-lever or separate taps set with PTFE tape and thread compound at every joint.
Non-fungal sanitary silicone applied along the full basin perimeter to keep moisture out.
Flow confirmed and every joint inspected for drips before the technician leaves.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
No, it can share the same trap provided there is sufficient fall. We check the trap depth and outlet diameter first to ensure no bottleneck occurs.
Usually one visit suffices, between one and two hours depending on distances to the supply and trap. We fit the basin, test supply and waste lines, then clean the site before leaving.
