Drain and supply check
Outlet position and height confirmed before the unit is placed

Farwaniya
Bathtub installation in Hassawi begins by checking the existing drain outlet and its fall toward the main stack. We set the unit perfectly level, seal all openings and joints, then pressure-test under full water flow before handover.
Hassawi houses are mostly older with cramped guest bathrooms, aged tile floors and underground drainage runs. When installing a new bathtub we first check that the drain line has no sharp bends or partial blockages, because a bathtub empties a large volume of water fast. We remove the old tub and bed the new one on a thin sand and cement screed so it sits without movement, then seal the base with waterproofing compound before finishing the surrounding tiles.
Hassawi lies in Farwaniya governorate, an older residential district where most bathrooms share a common underground drain system.
Before retiling, the tub is filled and emptied with hot and cold supply together to check every connection for leaks.
Outlet position and height confirmed before the unit is placed
Bath feet adjusted until all four sides read level
Waste and overflow set fitted with a proper sealed gasket
Hot and cold lines connected with isolation valves and braided hoses
Non-fungal sanitary silicone along the full bath-to-tile joint
Unit filled and drained to verify every joint before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
No, because the tub needs a solid and perfectly level bed underneath. We remove the tile in the tub area, lay a new cement base of set thickness and then adjust the tub level on it.
Water pooling in the bathroom after the tub empties or a foul smell from the drain. We send a camera inside the pipe or probe it with a steel rod before installing the new tub.
