Position and height
Basin set at a practical height and checked level before any connection is made.

Farwaniya
Ablution basin installation in Ruqai starts by examining the house layout and locating existing floor traps and main drainage lines. We choose a fixed point on the wall or corner, connect the basin to cold and hot water, then open a waste route that follows the natural fall of the floor.
Ruqai has a mix of residential buildings from small villas to family apartment blocks, meaning each house has a different drainage layout. We measure the height difference between the basin and nearest trap to ensure a fall of at least two centimetres per metre. Where levels are tight, we raise the outlet point or use a wall-hung basin with waste pipes clipped to the wall.
Ruqai sits in Farwaniya governorate, a mixed residential area where each basin requires separate calculations for fall and distance.
We check pipe fall with a laser level before tiling over it to confirm no standing water pockets.
Basin set at a practical height and checked level before any connection is made.
Trap and rubber seal fitted so waste drains fully with no odour return.
Braided flexible tails connected to isolation valves for future servicing.
Single-lever or separate taps set with PTFE tape and thread compound at every joint.
Non-fungal sanitary silicone applied along the full basin perimeter to keep moisture out.
Flow confirmed and every joint inspected for drips before the technician leaves.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
With a steady fall of two centimetres per metre, the pipe can run up to eight metres without issue. Beyond that you need a trapped vent or stepped run to redirect drainage downward.
We do not recommend it because the hot pipe may cause thermal expansion under the wall and crack the plaster. We position the basin beside the hot line rather than directly above it.
