Position and height
Basin set at a practical height and checked level before any connection is made.

Capital
Ablution basin installation in Rawda benefits from modern villas with planned supply pipes and clean floor traps. We measure the family's preferred height, run waste with steady fall, connect hot and cold water clearly and test every connection before finishing.
Rawda homes beside Rawda Park have relatively spacious guest bathrooms with modern, orderly drainage. We position the basin near the wall where existing supply pipes run, and rarely need long extensions. Waste drains easily because Rawda floor traps sit in clean sand without historical blockages. We test each basin by filling the bowl and opening the outlet to watch the flow.
Rawda lies in Kuwait governorate in a leafy district near Rawda Park, a quiet and secure residential zone.
We seal every installation with a written checklist covering bowl height, waste fall, water pressure and zero leakage from joints.
Basin set at a practical height and checked level before any connection is made.
Trap and rubber seal fitted so waste drains fully with no odour return.
Braided flexible tails connected to isolation valves for future servicing.
Single-lever or separate taps set with PTFE tape and thread compound at every joint.
Non-fungal sanitary silicone applied along the full basin perimeter to keep moisture out.
Flow confirmed and every joint inspected for drips before the technician leaves.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We use a spirit level from the start when fixing the bowl. The waste line must fall at least one centimetre per metre toward the trap.
No, unless the basin draws from a roof line. We usually tap into the pump pressure lines already in the villa.
