Drain and supply check
Outlet position and height confirmed before the unit is placed

Farwaniya
Bathtub installation in Ruqai requires checking the waste channels under old tiles and ensuring adequate fall to the trap. We remove any old tub, prepare the base, set the new unit with flexible silicone and run a pressure test.
Ruqai has medium-sized houses with narrow bathrooms where expanding the base is difficult. The tub must reach the floor trap on a steady fall, and sometimes existing pipes are only 65 mm diameter, which is tight. We test the existing outlet and measure available fall before buying the tub to avoid extra work under tiles.
Ruqai is in Farwaniya governorate, a residential block near Ruqai Co-op where buildings are modest in size.
Every waste joint is checked with petroseal dye to ensure no leaks before tiles are replaced.
Outlet position and height confirmed before the unit is placed
Bath feet adjusted until all four sides read level
Waste and overflow set fitted with a proper sealed gasket
Hot and cold lines connected with isolation valves and braided hoses
Non-fungal sanitary silicone along the full bath-to-tile joint
Unit filled and drained to verify every joint before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Only if the existing trap is far enough away and the fall allows a longer waste line. We measure distance and height first, then suggest the best size.
We test them under full flow from both tap and tub to see capacity. If slow, we upgrade waste pipes to larger diameter from trap to tub.
