Waste outlet check
Height and position confirmed before the shower tray is set.

Farwaniya
Shower installation in Abdullah Mubarak requires checking older building foundations and finding the best anchor point without weakening the wall. We re-level the floor if needed, then mount the body, run supply and test drainage and flow with care.
Homes in Abdullah Mubarak were built over decades, and many have older concrete walls with small voids or hairline cracks. We tap the wall and scan it to confirm the area is solid, then choose three distributed anchor points rather than loading one spot. Floors here are often basic and rarely perfectly level, so we measure the pitch before setting the trap or adjusting the waste run.
Abdullah Mubarak sits in Farwaniya governorate near Sixth Ring Road and has housed families and individuals for decades.
Every shower body is tested under continuous flow for three minutes after sealing because older walls can weep slowly.
Height and position confirmed before the shower tray is set.
Tray levelled and trap sealed with a rubber gasket.
Hot and cold lines connected to the mixer with isolation valves.
Mixer and arm fitted with thread sealant on every joint.
All tray-to-wall edges sealed with non-fungal sanitary silicone.
Water run and full drainage confirmed before handover.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, if the new wall is solid concrete and reasonably close to the main waste line. We fill and patch the old holes, then drill new ones in the better position. If drainage is distant we run a fresh pipe beneath the floor.
No, we install and test the body first, then let it cure for at least one day. Once we confirm no leaks, we begin sealing and tiling. This prevents tile failure from trapped moisture.
