Drain and supply check
Outlet position and height confirmed before the unit is placed

Jahra
Bathtub installation in Jahra New starts with assessing the concrete floor, the existing drain outlet and confirming the unit will sit level. We set the tub on its feet, place a spirit level on the rim and adjust each foot until no curve appears in the body. Then the drain and all connections are tested under high pressure and every gap is sealed with silicone.
Modern apartment blocks in Jahra New near the mall and hospital are built on solid foundations, but bathrooms sometimes have floors needing levelling compound. An old drain outlet may be too deep or far from where you want the tub, meaning new waste pipes under tiles may be needed. We measure distance and height first and decide whether to enlarge the opening or shift the unit position.
Jahra New is located in Jahra governorate, a zone of rapid urban development with modern residential buildings and new public facilities.
After installation, the drain is run at full water flow for five minutes and every joint is checked from underneath for any drips.
Outlet position and height confirmed before the unit is placed
Bath feet adjusted until all four sides read level
Waste and overflow set fitted with a proper sealed gasket
Hot and cold lines connected with isolation valves and braided hoses
Non-fungal sanitary silicone along the full bath-to-tile joint
Unit filled and drained to verify every joint before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but this requires cutting the floor and opening existing pipes under the tiles. We check distance and available fall before starting, because running pipes horizontally needs a steady slope towards the main stack. After extension, the floor and tiles are reset.
We use a cement levelling compound under the tub feet to correct small to moderate slopes. If the difference is more than five centimetres we discuss with you whether to resurface the floor or raise the tub with a thick pad.
