Site and drain check
Measure the bay and confirm drain fall before moving the unit

Jahra
Planning jacuzzi installation in Jahra (New) during construction is simpler than adding one later. For houses going up near Jahra Mall and the New Jahra Co-op, we set the waste, supplies and pump space before the screed and tiles, so the tub drops into a prepared position.
At first fix stage the bathroom is still open, so the waste can be laid at the right level and fall without cutting finished floors. In the new family homes of Jahra (New), we work from the chosen model's installation drawing to place the outlet, hot and cold supplies, and a marked zone for the electrician's pump point. We cap and pressure test the supplies, then return after tiling to set, connect and commission the tub.
Jahra (New) is a Jahra governorate residential district with ongoing house construction near Jahra Mall and Jahra Hospital.
Jacuzzi manufacturers supply installation drawings that fix the outlet and supply positions before tiling.
Measure the bay and confirm drain fall before moving the unit
Set the unit level so water drains fully without pooling
Hot and cold lines connected with accessible isolation valves
Deep-seal trap sized to the unit outlet, preventing drain odour
Verify pump connection point and electrical outlet with the electrician
Sanitary silicone on all edges, full water test before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Before the bathroom floor is screeded. The model's drawing sets the outlet and supply positions, and changing them after tiling means cutting finished surfaces.
Yes. We coordinate with the contractor on the first fix and return for final connection once the tiling is complete.
