Drain and supply check
Outlet position and height confirmed before the unit is placed

Jahra
Bathtub installation in Naeem starts by clearing the bathroom and removing any old tub. We inspect the waste pipe condition, position the new unit with precise alignment and test drainage under full flow before refitting fixtures and accessories.
Naeem bathrooms are in medium-sized family homes, most renovated in recent years. Floors are reliable and drainage properly installed, so we focus on precision in levelling and sealing. We verify the tub does not rest on any floor bump and every contact point sits evenly. We test the drain with cold and hot water together because thermal expansion can stress joints.
Naeem is a modern residential neighbourhood in Jahra governorate marked by orderly development and reliable basic utilities.
We test Naeem tub installations with hot water an hour after fitting because hot water reveals weak joints.
Outlet position and height confirmed before the unit is placed
Bath feet adjusted until all four sides read level
Waste and overflow set fitted with a proper sealed gasket
Hot and cold lines connected with isolation valves and braided hoses
Non-fungal sanitary silicone along the full bath-to-tile joint
Unit filled and drained to verify every joint before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
In Naeem we use a thin sand and cement layer under the tub to distribute weight evenly. This reduces cracking risk if any slight floor settlement occurs.
We test it at least twice: once with cold water and again with hot water an hour later. Each test runs for five minutes to observe any seepage from the body or joints.
