Drain and supply check
Outlet position and height confirmed before the unit is placed

Farwaniya
Bathtub installation in Rai Industrial serves the administrative and residential buildings there. We check hot and cold water supply availability, secure the tub firmly on a concrete base, seal edges and test both drainage and fill together.
Rai Industrial buildings are modern with staff bathrooms designed to current standards but may need bathtub updates. Supply pipes are usually hidden in walls and waste runs through set channels under tile. When installing a new tub we verify that supply outlets sit at the right height so the tub needs no major raising or lowering. We test supply and drain pressure together and ensure the base seal is fully waterproof because of heavy daily use.
Rai Industrial sits in Farwaniya governorate as a modern commercial and industrial zone near The Avenues Mall.
Both taps run together for five continuous minutes to test the drain under real working load.
Outlet position and height confirmed before the unit is placed
Bath feet adjusted until all four sides read level
Waste and overflow set fitted with a proper sealed gasket
Hot and cold lines connected with isolation valves and braided hoses
Non-fungal sanitary silicone along the full bath-to-tile joint
Unit filled and drained to verify every joint before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
It depends on the new pipe length and required slope. We measure distance and heights first, then advise whether new runs are needed under tile or existing connections can be reused.
Heavy-duty tubs have thicker bases and stronger seals and withstand more fill and drain cycles. We choose the right tub for you based on daily bathroom users.
