Waste outlet check
Height and position confirmed before the shower tray is set.

Farwaniya
Shower installation in Rai Industrial serves workers and warehouses with heavy-duty facilities and high-volume bathrooms. We reinforce the fixture with extra steel backing, install robust quick-shut valves and test pressure and drain for thousands of uses.
Rai Industrial warehouses have central communal bathrooms with hundreds of daily uses and simple industrial wall materials. The shower here needs heavy steel backing and thick pipes to handle high pressure and continuous flow throughout the day. We install an easy-access main water stopcock near the bathroom entrance so any leak can be shut off immediately without accessing the roof or internal walls.
Rai Industrial is in Farwaniya governorate, a dense industrial zone beside The Avenues Mall where buildings are warehouses, workshops and large storage yards.
We test the shower under steady pressure for one hour before handover because a small leak in the mounting may only show after weeks of heavy use.
Height and position confirmed before the shower tray is set.
Tray levelled and trap sealed with a rubber gasket.
Hot and cold lines connected to the mixer with isolation valves.
Mixer and arm fitted with thread sealant on every joint.
All tray-to-wall edges sealed with non-fungal sanitary silicone.
Water run and full drainage confirmed before handover.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, we install a relief valve set to seven bar maximum to protect pipes from sudden pressure spikes. Excess pressure diverts to a separate drain so water flow is not disrupted.
We check all joints with water at the test pressures before handover. If leaks appear later we disassemble the backing, test hidden pipes and replace any weak joint with a tighter metal connector.
