Drain and supply check
Outlet position and height confirmed before the unit is placed

Farwaniya
Bathtub installation in Rehab starts with checking the existing drain outlet and levelling the floor to prevent pooling. We position the tub precisely, connect the waste line, seal all edges and feet with silicone, then run a full pressure test.
Rehab houses are often older builds and the main bathroom floor may be uneven from subsidence or slow settling. We use a laser level to measure any deviation and create a fast-set cement base under the tub feet if needed. Old waste lines may have small diameter or sharp bends, so we test them with trial water before connection.
Rehab sits in Farwaniya governorate as a family district served by Rehab Co-op where most houses were built two decades ago.
Every drain connection is tested by pumping water under pressure for two minutes before final silicone sealing.
Outlet position and height confirmed before the unit is placed
Bath feet adjusted until all four sides read level
Waste and overflow set fitted with a proper sealed gasket
Hot and cold lines connected with isolation valves and braided hoses
Non-fungal sanitary silicone along the full bath-to-tile joint
Unit filled and drained to verify every joint before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, we build a cement base under all four tub feet to correct the level. We measure the deviation, add fast-set cement in stages until flat, then mount the tub.
Not necessarily; we test it first with full water flow to see if it drains quickly. If it drains well we use it, but if it is slow or blocked we recommend a new one.