Washbasin and wall-hung basin
Countertop or wall-hung, with supply lines and a sealed waste trap.

Ahmadi
Fixture installation in Hadiya often starts with owners of new villas wanting to fit bathroom taps or kitchen spouts from scratch. We mark each fixture position, run water lines from the main meter, connect waste and run full pressure to test every threaded joint.
Hadiya contains new residential villas and thin-walled buildings, and in most the plumbing work is incomplete or needs rebuilding. During installation we work from an engineering plan that sets pipe routes under floors and ceilings before cladding and painting. Near Hadiya Co-op many luxury villas request completely hidden pipes and premium taps with architecturally designed waste trays. At each basin we test cold and hot supply separately and together to ensure balanced flow.
Hadiya sits in Ahmadi governorate near Ahmadi Town, a new developing zone with contemporary residential buildings.
Every tap and basin is tested under full pressure for at least three minutes before any wall or floor holes are sealed.
Countertop or wall-hung, with supply lines and a sealed waste trap.
Wall or counter mount with correct waste outlet and supply valves.
Pan, cistern or in-wall frame, sealed base and flush line fitted correctly.
Tray, linear drain, riser and mixer connected and water-tested before tiling.
Set level, overflow solvent-welded, mixer and waste fully connected.
Supply, pump and jet lines connected with pressure test before finishing.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, if the building is not yet finished. We run copper pipes inside wall ducts prepared before cladding, then mount the taps and basins on the facade. If the building is complete we may need to open walls or choose an alternative visible route.
We open the tap to mid-flow and watch whether the water leans cold or warm. If one is stronger we adjust the mixing valve screw in the tap body until flow balances. We measure pressure in both supply lines separately before sealing any walls.
