Site and drain check
Measure the bay and confirm drain fall before moving the unit

Capital
A jacuzzi in Faiha requires widening water lines from the main meter. We inspect the floor drain and ventilation, then fit the pump and jets. Full testing includes checking all connections and flow rates.
Faiha's quiet family houses have comfortable bathrooms with stone and ceramic floors and old drain pipes under the foundation. A modern jacuzzi needs a separate new drain line to prevent backflow in old pipework. We measure the new pipe length from tub to main trap and test fall and flow under full load.
Faiha lies in a quiet suburb of Kuwait City near Faiha Park, a district of classic family houses.
The jacuzzi drain is separated from old lines because old pipes in Faiha tend to clog with lime scale.
Measure the bay and confirm drain fall before moving the unit
Set the unit level so water drains fully without pooling
Hot and cold lines connected with accessible isolation valves
Deep-seal trap sized to the unit outlet, preventing drain odour
Verify pump connection point and electrical outlet with the electrician
Sanitary silicone on all edges, full water test before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We inspect the trap first with a camera. If it is blocked with scale we clean it or cast a new trap beside it. Testing with a full tub dump confirms adequate capacity.
We cut narrow channels in the foundation, lay PVC pipes with steady fall and test flow. Openings are sealed with flexible mortar that tolerates foundation movement and thermal expansion.
